47 AI and hyperscale data center projects that could mean work for electricians, HVAC techs, equipment operators, and construction crews. Each project shows whether we confirmed it against an official source. This isn't a list of every U.S. data center. It focuses on large projects with major construction work for the trades, so many smaller and regional sites aren't included.
Data as of Oct 19, 2026. Each card shows its own source date.
New data center projects, hiring news and trade career tips by email.
VerifiedChecked against the linked source; no change found.
Verified: changedChecked against the linked source; details were updated.
NewNewly added from the linked source.
UnverifiedNot confirmed by an official source. Treat as a lead, not a fact.
Power figures are listed per project as reported. They use different measures (lease, IT load, grid contract) and are not added together.
Filter
Showing 47 of 47 projects
VerifiedAs of 2026-08-29
Stargate Abilene (flagship)
Abilene, TX
Owner:
OpenAI / Oracle / Crusoe
Status:
operating (partial; construction continues)
Power (MW, this project only):
~1,200 (core campus)
Notes:
A third-party tracker says partially operational; cites Oracle's tracker at 42% delivered. A neighboring 900 MW expansion is a Microsoft project, not OpenAI. OpenAI (2025-09-23) said the site was 'up and running'. Includes the Phase 2 expansion (previously listed separately).
Power status:
energized (documented) (as of 2025-09-23)
Power notes:
Per OpenAI operating statement, 2025-09-23 ('up and running on OCI'); no utility energization record. The utility serving the site isn't named in the sources we checked.
OpenAI / Oracle / Vantage Data Centers (developer)
Status:
announced (contracted; under development)
Jobs:
25,000+ onsite jobs claimed across 3 Oracle sites plus Abilene expansion (OpenAI; not site-specific)
Notes:
Customer delivery planned for H1 2027, per a third-party tracker. See also OpenAI's 2025-09-23 release. Also announced as Vantage Frontier; previously listed twice.
Power source:
on-site
Power notes:
Oracle site page (undated; fetched 2026-10-25): 'rely on its own onsite power system... microgrid'. Oracle/OpenAI fact sheet (2025-09-23). No permit/energization document found.
Data center buildings under construction; more than 4,000 workers on site, and buildings "near completion" but without power (Santa Fe New Mexican via KRWG, 2026-10-19). Construction of the on-site Bloom fuel-cell microgrid has not started pending the NMED air permit (same source). The permit hearing is set to begin Dec 7, 2026 and may be postponed (Source NM, 2026-10-19). The NM Supreme Court lifted both stays 2026-09-17 (NMED docket item 97).
Notes:
Pending: motions to dismiss, including New Energy Economy's (docket item 107, filed 10/14/2026); hearing Oct 26 (Source NM; docket item 111). Also the Oct 29 discovery hearing and the Dec 7 permit hearing. Under construction bar met by the Oracle release (2026-10-13, primary); docket supports the legal status only. Not paused or stalled: no stall trigger met. Prior status 'under construction (legal stays pending)' (2026-08-29, stargate.how) superseded.
Power status:
pending (as of 2026-10-16)
Power source:
on-site
Power notes:
Oracle (2026-10-13): Bloom fuel-cell microgrid remains primary power; proposed El Paso Electric agreement for construction, commissioning and emergency backup (proposed). NMED air permit AQB 26-57(P) pending; Second Amended Scheduling Order 2026-10-16.
OpenAI said SoftBank 'has broken ground' and expected operation in 2026. No newer delivery disclosure (tracker, 2026-08-29). Later reporting links the site to SoftBank/Foxconn equipment manufacturing; not confirmed operational.
operating (building 1); building 2 under construction
Jobs:
~10,000 construction workers over two years (building 1)
Notes:
First facility fully operational 2026-06-23. Second facility due 2028. ~550 FTE now, ~800 expected.
Power status:
energized (documented) (as of 2026-06-23)
Power notes:
Per Microsoft operating statement, 2026-06-23 (first facility 'fully operational' after equipment brought online in April 2026); no utility energization record.
Microsoft (site on QTS Fayetteville campus, per AJC reporting)
Status:
partially operating
Status detail (as of 2026-06-04):
Microsoft's Fairwater Atlanta building(s) have operated since Oct 2025 (Microsoft). The public sources we checked don't say how many buildings are running or whether Microsoft will use the others. Other QTS campus buildings are under construction, and the City expects construction to continue into 2029.
Notes:
Status reflects the QTS campus (site unit; scope changes 2 and 4 approved by Scott 2026-10-25). Construction evidence: City of Fayetteville and QTS statements quoted by The Citizen (May 11 and Jun 4, 2026). No primary permit record retrieved: the city portal returned 403. Campus planned for up to 13 buildings (The Citizen, 2026-05-11). The site is in Fayetteville, not Atlanta proper. Third-party MW figures disagree (433 / 636 / 859 MW / ~1,500 MW campus); none confirmed by Microsoft.
Power status:
energized (documented) (as of 2025-11-12)
Power notes:
Per Microsoft operating statement, 2025-11-12 ('began operation in October' 2025); no utility energization record.
2,200+ at full build (electricity draw) (utility/grid draw)
Jobs:
4,000+ construction workers/day at peak (CNBC; site area incl. neighboring GM-Samsung plant context)
Notes:
7 buildings online as of Oct 2025; 30 planned. $11B. Newer building counts on trackers not verified.
Power status:
energized (documented) (as of 2025-10-29)
Power source:
grid
MW basis:
grid or utility contract
Power notes:
Per Amazon operating statement, 2025-10-29; no utility energization record. Amazon: Project Rainier 'fully operational' (St. Joseph County, IN named as a site). Grid/I&M: CNBC and Inside Indiana Business (2 independent secondary).
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Amazon Web Services
Reported status (unverified):
under construction
Notes:
This listing is a region, not a single project.
Sources: No source link yet.
Verified: changedAs of 2026-07-13
Meta Hyperion (Richland Parish Data Center)
Richland Parish, LA
Owner:
Meta
Status:
under construction
Power (MW, this project only):
5,000 (compute capacity)
Jobs:
7,500+ at peak construction
Notes:
Investment is now 'more than $50B'. Broke ground Dec 2024. 1,000 operational jobs. Entergy generation package still under LPSC review per news (not independently verified).
Power status:
permit or interconnection approved (as of 2025-08-20)
Power source:
grid
MW basis:
other
Power notes:
LPSC approved Entergy Louisiana's 3 combined-cycle plants and transmission for Meta (4-1). Richland plants expected online late 2028. Utility-owned plants dedicated to the load; typed grid (utility supply). LPSC approval announced by Entergy; supersedes the 'under review' line in notes.
under construction; third-party reports partial operation
Power (MW, this project only):
1,000+ (compute capacity)
Jobs:
1,200 skilled trade workers at peak
Notes:
Meta fact sheet uses future tense ('will play a vital role'). Drone-imagery analysts say the south section is operating; not confirmed by Meta.
Power source:
grid
MW basis:
other
Power notes:
Meta fact sheet: 'worked with AEP' on energy needs. Williams' Socrates gas plants not tied to Meta by a document. Fact sheet undated; URL path 2026/09.
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Meta
Reported status (unverified):
announced
Power status:
pending (as of 2026-10-21)
Power notes:
PUC Docket 59076: administrative law judges recommend approving El Paso Electric's 366 MW McCloud plant only with a hold-harmless condition (exceptions letter 2026-10-21). Final PUC order expected by 2026-12-07 (KVIA).
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Google
Reported status (unverified):
under construction
Sources: No source link yet.
Unverified
Google Columbus / New Albany
Columbus area, OH
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Google
Reported status (unverified):
operating
Power status:
energized (documented)
Power source:
grid
Power notes:
AEP Ohio (undated): permanent service to Google's New Albany data center 'energized in March'; year not stated. Covers the original facility, not the expansion.
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Google
Reported status (unverified):
under construction
Sources: No source link yet.
UnverifiedAs of 2025-12-01
Vantage Virginia campus
Stafford County, VA (Fredericksburg region)
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Vantage Data Centers
Reported status (unverified):
announced
Notes:
Construction Dive mentions in passing a Vantage $2B three-building campus in Stafford County; a 192 MW figure was not confirmed.
Power source:
grid
Power notes:
Vantage VA4 page (undated; fetched 2026-10-25): 'Power provided by Dominion Energy'; private 270 MW on-site substation. Match of VA4 to this row is from the ownership pass (PARTIAL).
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Anthropic / Fluidstack
Reported status (unverified):
announced
Sources: No source link yet.
Unverified
Anthropic / Fluidstack (New York)
New York (site not announced)
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Anthropic / Fluidstack
Reported status (unverified):
announced
Sources: No source link yet.
VerifiedAs of 2026-07-21
Compass Datacenters Meridian campus
Lauderdale County (Meridian), MS
Owner:
Compass Datacenters
Status:
under construction
Jobs:
1,050+ workers on site (count of 2026-07-21)
Notes:
8 buildings of ~250k sq ft; first building expected near end of 2026; ~$10B; ~300 permanent jobs. The county page doesn't name Compass, and a 320 MW figure was not confirmed.
Power status:
permit or interconnection approved (as of 2025-02-07)
Power source:
grid
Power notes:
Mississippi PSC approved special contract between Mississippi Power and Compass Datacenters Jan I, LLC.
Broke ground ~Dec 2025. $3B. Phases: 300 MW in 2027, 300 MW in 2030, 300 MW in 2033-35.
Power source:
grid
MW basis:
grid or utility contract
Power notes:
CleanArc: agreement with Rappahannock Electric Cooperative to begin construction of first substation; 300 MW 'ready for service in 2027'. Not an approval or energization.
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Tract
Reported status (unverified):
announced
Power source:
both
Power notes:
Tract: Bluebonnet/LCRA on-site substation (first 250 MW contracted for Q1 2028) plus planned on-site generation that 'will become grid connected'. Contract is not an approval.
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Novva Data Centers
Reported status (unverified):
under construction
Sources: No source link yet.
Unverified
NTT Data Hillsboro expansion
Hillsboro, OR
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
NTT Data
Reported status (unverified):
under construction
Sources: No source link yet.
Unverified
NTT Data Phoenix expansion
Phoenix, AZ
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
NTT Data
Reported status (unverified):
under construction
Sources: No source link yet.
Unverified
CoreWeave Kenilworth
Kenilworth, NJ
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
CoreWeave
Reported status (unverified):
announced
Sources: No source link yet.
Verified: changedAs of 2026-08-05
TeraWulf Lake Mariner CB-5
Barker (Lake Mariner), NY
Owner:
TeraWulf (Fluidstack tenant)
Status:
under construction
Power (MW, this project only):
336 (CB-4 + CB-5 combined) (IT (critical IT))
Notes:
CB-5 phased delivery is now targeted for early 2027. 102 MW of critical IT is live at Lake Mariner. TeraWulf states an additional 336 MW across CB-4 and CB-5.
MW basis:
IT load
Power notes:
TeraWulf (2026-08-05): 102 MW live at Lake Mariner is CB-1 to CB-3; CB-4 and CB-5 (336 MW) are under construction. No CB-5 energization documented.
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Digital Realty
Reported status (unverified):
announced
Sources: No source link yet.
Unverified
Goodman Santa Clara
Santa Clara, CA
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Goodman Group
Reported status (unverified):
announced
Sources: No source link yet.
Unverified
Prime Data Centers Sacramento
Sacramento, CA
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Prime Data Centers
Reported status (unverified):
announced
Power source:
grid
Power notes:
Prime page (undated; fetched 2026-10-25): utility SMUD; SMF01-01 'Operational', SMF01-02 'Construction'. Row's match to this campus is PARTIAL and its TCH status is 'announced (unverified)', so energization isn't applied.
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
ExxonMobil / NextEra Energy
Reported status (unverified):
planning
Sources: No source link yet.
Unverified
xAI Colossus
Memphis, TN
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
xAI
Reported status (unverified):
operating
Notes:
Trackers report ~1 GW IT across Memphis/Southaven; not confirmed with a primary source.
Sources: No source link yet.
Unverified
Ranalli Super DC
Lysander, NY
Unverified: not confirmed by an official source. The details below are earlier reports kept for reference and may be out of date or wrong.
Reported owner (unverified):
Ranalli Super DC, LLC
Reported status (unverified):
announced
Sources: No source link yet.
Verified: changedAs of 2026-10-02
Applied Digital Polaris Forge 1
Ellendale, ND
Owner:
Applied Digital (CoreWeave tenant)
Status:
operating (partial); expanding
Power (MW, this project only):
250 operating / 400 contracted (IT (critical IT load))
Notes:
250 MW live of 400 MW contracted.
Power status:
energized (documented) (as of 2026-10-02)
MW basis:
IT load
Power notes:
Per Applied Digital operating statement, 2026-10-02; no utility energization record. Applied Digital: 250 MW critical IT 'fully operational'. Utility not named in fetched release.
Effingham County, GA (Savannah Gateway Industrial Hub)
Owner:
OpenAI (land held by affiliate Octans GA, LLC)
Status:
announced (pre-development; power contract approved)
Power (MW, this project only):
3,210 (Georgia Power contract; '3.2 GW' per OpenAI) (utility/grid service)
Jobs:
'thousands of construction and permanent on-site jobs' (OpenAI; no number)
Notes:
Power phased 2028-2032. PSC staff deemed the 3,210 MW contract approved 2026-08-26. Georgia Power's Q2 2026 report lists a redacted 3,210 MW data center in 'pending construction' as of 2026-06-30. That match is inferred from size. $20B per county/OpenAI coverage.
Power status:
pending (as of 2026-08-26)
Power source:
grid
MW basis:
grid or utility contract
Power notes:
Georgia Power (2026-08-26) says the 3,200 MW contract was 'approved as part of the regulatory process'; CBS Atlanta reports that PSC staff declined to object and there was no commission vote. Set to pending per the conflict rule. Delivery phased 2028–2032 (OpenAI, 2026-07-22).